Reconstruction of the Station Building Completed at the Taiynsha Railway Station
27-06-2026
In the North Kazakhstan Region, the reconstruction of the railway station at the Taiynsha station, originally built in 1958, has been completed. As a result of the modernization, the building's floor area has been increased from 374.6 to 579.72 square meters.
During the works, the station building was completely renovated: the roof and engineering networks for water supply, sewage, heating, power supply, and low-voltage systems were replaced; both interior and exterior finishing were completed; and the surrounding area and the platform were landscaped. A new entrance group was constructed, and modern furniture along with the necessary equipment were installed.
Modern, durable, and fire-safe materials were used during the reconstruction. The facade was clad with linear metal panels, interior spaces were updated, and modern ceiling systems and floor coverings were installed.
Special attention was paid to creating a comfortable and safe environment for passengers. The building is equipped with extra emergency exits, a ramp for citizens with limited mobility, and tactile paving.
The Taiynsha railway station is classified as Class II. Twelve passenger trains run through the station, connecting the region with Astana, Almaty, Petropavlovsk, Karaganda, Kyzylorda, as well as with Kyrgyzstan and Russia.
Press service of JSC «NC«Kazakhstan Temir Zholy»