Слайд



Passengers Shippers

Online ticket purchase

Start typing the name of the station, then select a station from the list

Press releases

Up to 4 million tons of cargo is planned to be transported by Trans-Caspian International transport route in 2018



On February 16 this year, under the chairmanship of the head of JSC "NC" Kazakhstan temir zholy "Kanat Alpysbaev, the General meeting of the members of International Association "Trans-Caspian International Transport Route"(TITR) in Ankara was held.






Information message

There was an accident on the stretch of Maraldy-Shcherbakty Pavlodar branch of the railroad

February 14 at 22 hours 34 minutes at the highway crossing of the stretch Maraldy - Shcherbakty of the site Pavlodar-Kulunda, a diesel locomotive collided with a passenger car.

Train No. 1514 moved with a speed of 56 km / h. The devices of automatic crossing alarm worked fine. The driver of the car broke the traffic rules - goes through the highway crossing after activation of the light signal prohibiting passage.






Over a thousand violators of the rules for crossing the railway tracks were detained in 2017

Railwaymen together with the transport police organized in 2017 about a thousand raids to ensure the safety of citizens on the main tracks.

"We constantly hold meetings, talks with residents of settlements near the railroad tracks. We pay special attention to schoolchildren; we talk about the rules of behavior in the zone of increased danger, "says Zhantore Yesengarayev, manager of the Situational Center of the Branch of JSC" NC "KTZ" - "Directorate of the Backbone Network".






At 80 railway stations, the delivery time of wagons for loading was reduced

Delivery of empty wagons for loading at extra-class stations and stations of the first class from the moment of determining the consignor of the delivery time will be reduced from 12-15 hours to no more than 4 hours, at stations of the second class - from 10-12 hours to 5 hours, at stations of the third class - from 10 -15 hours to 6 hours.

At the same time, wagons under loading on the access roads must be in accordance with the turnover norms stipulated by the Single technological process of the access road operation and the junction stations.






The cargo turnover in JSC "NC" KTZ "has increased by 2.5% since the beginning of February

 






JSC "NC" KTZ” will form anti-washout trains for spring floods






In JSC "NC" KTZ" were discussed the issues of Introduction blockchain technology in the railway industry

 






The third container train with Kazakhstan’s grain is shipped from Zhaltyr station to the port of Ho Chi Minh City

 






JSC “Passenger transportation” will increase the quality of services in 2018



February 9 this year president of JSC "Passenger transportation" Arman Sultanov held a meeting on the results of work for 2017 and tasks for 2018.

In the course of conference reports of the branches and subsidiaries of the company were heard.


The President of the company focused on the issues of increasing the efficiency of the activities of JSC "Passenger transportation", improving the quality of services, and the level of training of service personnel.






“Internal trainers” taught more than 1000 employees of JSC "NC" KTZ” in 2017

 






Syndicate content

«NC «KTZ» transformation
«NC «KTZ» transformation
«NC «KTZ» privatization
«NC «KTZ» privatization
© АО «НК «Қазақстан темір жолы»
Политика информационной безопасности
Ваш отзыв очень важен для нас
Оценка дизайна web-сайта